ALIQUOT ASSOCIATES
  • Home
  • About Us
    • Our Story
    • Leadership
  • Services
    • Civil Engineering
    • Traffic Engineering
    • Land Surveying
  • Projects
  • Careers
  • Contact
  • Leadership
  • Home
  • About Us
    • Our Story
    • Leadership
  • Services
    • Civil Engineering
    • Traffic Engineering
    • Land Surveying
  • Projects
  • Careers
  • Contact
  • Leadership
VTA-BART Berryessa Station Parking Garage
Picture
Picture
VTA-BART Milpitas Station Parking Garage
Picture
Picture
VTA-BART Silicon Valley Berryessa Extension, Milpitas Station and Berryessa Station Parking Structures, San Jose, CA

The first phase of the 16-mile BART Silicon Valley extension of the regional BART system, this project includes the Berryessa and Milpitas parking structures and surrounding improvements. A three-phase project for each station included design development, construction documents, and construction support services.

Aliquot provided pre-project surveying services including construction staking of rough grading, pad certification, curb and gutter staking, storm drain and catch basins, sanitary sewer, fire service and hydrants, as well as building grids. ​The engineering work consisted of interfacing with the adjoining roadway, pedestrian walkway, utilities, bicycle path, and station plaza. Civil Engineering services included design development and construction documents, submittal review, construction meetings, approvals, close out final record drawings. Aliquot interfaced with various public and utility agencies for both stations.
All Projects
EMAIL: ​info@aliquot.com 
TELEPHONE: (925) 476-2300 | FAX: (925) 476-2350

WALNUT CREEK
​1390 S. Main Street, Suite 310 | ​Walnut Creek, CA 94596

​OAKLAND​
953 West MacArthur Blvd., Suite 11 | Oakland, CA 94608
Picture
Picture
Picture
© 2018 Aliquot Associates, Inc. All Rights Reserved.