ALIQUOT ASSOCIATES
  • Home
  • About Us
    • Our Story
    • Leadership
  • Services
    • Civil Engineering
    • Traffic Engineering
    • Land Surveying
  • Projects
  • Careers
  • Contact
  • Leadership
  • Home
  • About Us
    • Our Story
    • Leadership
  • Services
    • Civil Engineering
    • Traffic Engineering
    • Land Surveying
  • Projects
  • Careers
  • Contact
  • Leadership
Christie Avenue, Emeryville
Picture
Picture
Picture
Picture
Christie Avenue Bay Trail Gap Closure Class I Bike Path and Pedestrian Intersection Improvements, City of Emeryville

​Aliquot was retained by the City of Emeryville to convert a vehicular travel lane into a Class I Bikeway. This project required the study and design of a multimodal route through Christie Avenue between Powell Street and Shellmound Street, as well as redesigning three existing impacted intersections. Aliquot provided right-of-way engineering, engineering design, hydrology and hydraulics calculations, and land surveying services.

​The services in the Conceptual Design Phase included topographic survey, final conceptual design, and preliminary cost estimate. The Detailed Design Phase included PS&E documents. The project required eliminating one of the travel lanes and merging it with the existing sidewalk to create a separate Class I Bike Path and a separate pedestrian walkway. In addition, a C.3 bio-retention basin landscape strip was incorporated into the project.  Aliquot managed a team of consultants and met the City’s schedule and construction cost expectations. 
All Projects
EMAIL: ​info@aliquot.com 
TELEPHONE: (925) 476-2300 | FAX: (925) 476-2350

WALNUT CREEK
​1390 S. Main Street, Suite 310 | ​Walnut Creek, CA 94596

​OAKLAND​
953 West MacArthur Blvd., Suite 11 | Oakland, CA 94608
Picture
Picture
Picture
© 2018 Aliquot Associates, Inc. All Rights Reserved.